All Preaux Coatings Offers Stunning Floor Coatings With Extreme Strength And Expert Application

STEP 1
Concrete Prep & Repairs
Mechanically prepare the surface to accept the coatings and ensure proper adhesion. Repair significant cracks or pits in the concrete with a fast setting, low viscosity modified Polyaspartic repair material.

STEP 2
Apply Basecoat
The 2-part polyuria basecoat is applied with squeegees and rollers onto the concrete surface.

STEP 3
Broadcast Chips

STEP 4
Scraping the Chips
Once the basecoat is fully cured, the floor is scraped and smoothed, to remove any loose or vertical standing flakes.

STEP 5
Clean & Vacuum
The floor is cleaned and vacuumed to remove any excess particles.

STEP 6
Clear Topcoat
Lastly, the UV stable 2-part polyaspartic topcoat is applied
CALL US OR EMAIL US
Request a free estimate
Our knowledgeable flooring experts are standing by